久久精品aⅴ无码中文字字幕重口,蜜桃久久久电影,欧美最猛,日韩天天射

產(chǎn)品簡介
3SH液壓失效保護(hù)盤式制動(dòng)器
3SH液壓失效保護(hù)盤式制動(dòng)器
產(chǎn)品價(jià)格:¥1
上架日期:2011-09-21 22:24:27
產(chǎn)地:www.zhidongqichang.com
發(fā)貨地:焦作
供應(yīng)數(shù)量:不限
最少起訂:1臺(tái)
瀏覽量:520
資料下載:暫無資料下載
其他下載:暫無相關(guān)下載
詳細(xì)說明
     

    液壓失效保護(hù)盤式制動(dòng)器

     5SH 4SH 3SH 450SH ST1SH ST2SH ST3SH ST4SH

     SB(YQP) SBDST5SH ST10SH  ST16SH  ST25SH  ST25SH-A 

    1.      制動(dòng)器的安裝 brake install

    操作者站在制動(dòng)盤相對于制動(dòng)器的對面。

    Operator who stand in brake disc is opposite to brake device

    1.1    擰緊手動(dòng)松閘螺釘4(螺釘規(guī)格見表1)松開鎖緊的制動(dòng)器并移動(dòng)杠桿和摩擦襯墊,觀察和調(diào)整兩制動(dòng)摩擦襯墊間的間隙。

    注意:手動(dòng)松閘操作時(shí),切勿引起電磁鐵的運(yùn)動(dòng)。

     

     

     

     

    manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake and move the level and friction pad , observation and adjustment the gap between the brake and friction pad .

    attention: When operate the manual loose gate , make sure not to move the electro-magnet

    1.2(向上)順時(shí)針旋轉(zhuǎn)棘輪5的手輪1大約四分之一轉(zhuǎn)(微調(diào))

    (upward) clockwise rotate handwheels 1 of notch wheel 5 about 1/4 revolutions (trimming) www.yyzdq.com

     

    1.3(向下)逆時(shí)針旋轉(zhuǎn)螺母2(用一個(gè)ф4的銷子)以便退回回推桿3,這將增加襯墊6之間的間隙,繼續(xù)該操作,直到兩摩擦襯墊間隙超過制動(dòng)盤的厚度。

     (downward) anticlockwise rotate nut 2 (with a ф4 pin) in order to return the throwout lever 3, this will increase the www.7547588.comgaps between the pad 6, continues this operation, until the gap between two friction pads surpasses brake disc's thickness.

    1.4將制動(dòng)瓦置于其支撐物上,在制動(dòng)襯墊之間插入制動(dòng)盤,安裝底座連接螺栓(螺栓規(guī)格見表1

    Brake tile is placed on its strutting , www.zhidongqichang.com insert brake disc between the brake pad, installs the foundation connecting bolt (bolt specification is seen inTable 1 )

    1.5檢查:

    制動(dòng)盤端面跳動(dòng),最大值0.2mmwww.7547555.com

    A)     

    B)    制動(dòng)盤墊塊相對于底座度: 4%

    C)     制動(dòng)盤相對于底座的中心距(偏差)2.5mm

           注意

    油漆時(shí)不要蓋住顯示棘爪運(yùn)動(dòng)方向的板

    1.5 inspections:

    A) Brake disc ending beat, maximum value 0.2mm

    B) The brake disc cushion compared with the foundation: 4%

    C) compared with the brake disc ,the center of the base (bias) 2.5mm www.7547222.com

    Attention

    when paint do not cover the board that demonstrate the movement direction of pawl

    2.退距的調(diào)整draws back adjustment

    操作者站在制動(dòng)盤相對于制動(dòng)器的對面

    Operator who stand in brake disc is opposite to brake device

    2.1 擰緊手動(dòng)松閘螺釘4(螺釘規(guī)格見表1)松開鎖緊的制動(dòng)盤,并移動(dòng)杠桿和摩擦襯墊的間隙。

    注意:手動(dòng)松閘操作時(shí),切勿引起電磁鐵的運(yùn)動(dòng)。

    manually tightening screw 4 (screw specifications are seen in Table 1) loosen the locking brake, move the pad between level and friction pad .

    attention: When operate the manual loose gate , make sure not to move the electro-magnet

    2.2 (向下)逆時(shí)針旋轉(zhuǎn)棘輪5的手輪1大約四分之一(微調(diào))

    (downward) clockwise rotate the handwheels 1 of notch wheel 5 about 1/4 revolutions (trimming) www.zhidong7.com

     

    2.3 (向上)順時(shí)針旋轉(zhuǎn)螺母2(用一個(gè)ф4的銷子)直到早制動(dòng)摩擦襯墊和制動(dòng)盤間獲得0.5~0.7mm的總計(jì)間隙。

    (upward) anticlockwise rotate nut 2 (with a ф4 pin) until the space between early friction brake and brake disc was 0.5 ~ 0.7mm

    注意:在調(diào)整制動(dòng)摩擦襯墊時(shí),電磁鐵必須處于吸合狀態(tài)。(見圖3

    Attention: When adjustment brake friction liner, the electro-magnet must be in attracts gathers  condition. (see in Figure 3

    2.4 安裝好電磁鐵的防塵雨罩。

    Installs the dustproof rain shade to electro-magnet

    2.5 完全松開手動(dòng)松閘螺釘4并擰緊鎖定螺母。

    Loosen the bolt 4 compleby and screws tight the nut.

    //3、制動(dòng)器的電力聯(lián)接 connect brake device

    3.1 該制動(dòng)器必須與ESE型經(jīng)濟(jì)電源配套使用。

    3.2 打開接線盒的密封蓋,用2Xф10.5-ф15)的雙A芯電纜磁鐵的接線端子和ESE電源的十和一端子相連接,與極性無關(guān)。

    3.3 ESE電源的0-220-380電源的接線端子,必須接于相應(yīng)的單相電源上(電纜直徑見表)

    3.1 this brake must use together with the ESE economical power source.

    3.2 open the sealing gland of connecting box, with 2X (ф10.5-ф15) dual-core cables magnet ESE Terminal Blocks and power of ten and a terminal connected with nothing to do with polarity.
    3.3 ESE power 0-220-380 power of the terminals must be received in the corresponding single-phase power on (see table diameter cable)with the double A core electric cable magnet's binding clamp and the ESE power source ten and a post connect, has nothing to do with the polarity. 3.3 the ESE power source's 0-220-380 power source's binding clamps, must meet on the corresponding single-phase source (electric cable diameter see table)

     

     

在線詢盤/留言
  • 免責(zé)聲明:以上所展示的信息由企業(yè)自行提供,內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由發(fā)布企業(yè)負(fù)責(zé),本網(wǎng)對此不承擔(dān)任何保證責(zé)任。我們原則 上建議您選擇本網(wǎng)高級會(huì)員或VIP會(huì)員。
    0571-87774297  
    99精品日本| 日穴视频| 日本强奸自拍偷拍电影| 国产成人精品日本亚洲网站| 欧美日韩精品亚洲| 中文字字幕在线精品乱码| 在线播放成人| 免费最黄AAAA片| 4444kk亚洲人成电影在线| 综合狠狠色| 17c一起草观看| 亚洲国产成人久久综合区| 999久久久精品视频| 一边做饭一边躁狂怎么办| 亚洲呦呦呦91| 黑人捅爽女人| 成在人线av无码免观看| 欧美视频五月激情四射| 五月天停婷基地| 欧美色图日韩在线| 国产亚洲精品a视频| 小泽玛利亚一区二区免费| 国产欧美色悠悠| 国产一区二区久久精品涩爱| 亚洲三级片在线观| 日韩在线第七页| 久久99精品国产.久| 美女视频天天草| 久久99精品久久久大学生| 免费国产激情| 九色七七| 免费看AV兽交| 精品综合一二三区| 亚洲国产无遮挡大尺度| 久草人妻在线| 一区二区三区高清视频| 五月丁香综合国产精品| 九一福利社区| 日韩国产精品亚洲а∨天堂免| 成人午夜在线免费视频| 亚洲 无码 另类|